We need volunteers...

Chuck- It's not much to look at right now... some slightly dirty looking glass on a stand. I'll hopefully be filling it over the next week or so. The plumbing job is an epic one since there are 8 CL returns (to be attached to an OM 4-way), 1 CL intake, 2 overflows, and 2 sump returns in the bottom of this tank. We couldn't quite save all of the plumbing, so I'm having to redo some of it. Since I know I'll need to move this tank at least one more time, I'm trying to make it so that everything can be taken apart pretty easily and reassembled quickly. Since I'm needing to redo some of it anyway, I'm going to take Angela's advice and try to get the majority of the plumbing a little more out of the way. To do that I think I'll be using a mix of spa flex and rigid PVC. I need to conserve as much space as possible under the tank because all of the equipment needs to go under the tank.

To the guys and gals that helped us move- I'm missing a 1 inch bulkhead and a gasket for one of the other 1-inch bulkheads. I know these were getting thrown everywhere because we had a hard time getting some of them off, but I was wondering if anyone had a clue where they might be. It's possible there's one rolling around in the back of the truck or that they just got left behind at Angela's. It's also possible that it's actually at my place and hiding from me (our house is in utter chaos right now), but we've looked pretty good for them in the house and Moriah's car and haven't tracked them down. I'm also cleaned the sump underneath of the tank out and they are definitely not sitting in there.

I can always order them and if they come up somewhere just have extras, but I really don't want to have to wait for plumbing parts to be shipped.
 
Back
Top