1000 Gallon 3D Hole in the wall

GF valves and piping.

20140124_132119_zps30547be0.jpg


Overflow

20140124_130854_zps7b1de538.jpg


Closed loop piping

20140124_132105_zps4ed73fe9.jpg
 
This will be the Cryptic tank where the 3 side of the glass is covered up with black .

20140203_133358_zps70aa906d.jpg


More photo of the rack. Top right hand side will be the Refugium tank.

20140203_133353_zps7e396706.jpg


The frag tank

20140203_133401_zpsa4e5a89b.jpg
 
I don't see any bracing on your tank racks. Are the racks attached to the wall? How will you manage any lateral forces?

Dave.M
 
I don't see any bracing on your tank racks. Are the racks attached to the wall? How will you manage any lateral forces?

Dave.M

just don't bump into it and it will be fine :)

I'm amazed at how much trust people put in 80-20. The actual wall thickness of the extrusion where the hardware clamps things together is almost nothing.. but I guess it's working for them.

Sweet setup OP.. keep up the good work!:smurf:
 