Sorry for the long delay between updates... I've been awaiting a concreter to pour my sub-floor tanks. This happened today...
Here are some shots. Formwork pre-concrete:
Post concrete:
In the meantime, been working on the internal plumbing and mounting the hydrowizards (one of six 1000W lights on):
Here are some shots. Formwork pre-concrete:
Post concrete:
In the meantime, been working on the internal plumbing and mounting the hydrowizards (one of six 1000W lights on):