JB NY
Active member
Here is an update.
So the last two weeks have been spent finishing the new walls to the fish room and reinforcing the floor. It took a lot longer than I thought. Originally I thought I could just bang out the room in about 3 weeks total. Right now I think it will be 6 weeks to redo that room. So here are some picture of the progress.
Finished taping and spackling.
Here is the inside of the room.
Outside.
Here I am finally finished with the walls. All done attaching all the molding and painting the trim and the walls.
Inside.
Outside. I gotta hand it to the ability of the paint stores to match existing paint from a chip you pull off the wall. The walls in the basement are about 15 years old and they were able to match to the existing paint perfectly.
A close up of the LCD screen I attached to the wall.
So the last two weeks have been spent finishing the new walls to the fish room and reinforcing the floor. It took a lot longer than I thought. Originally I thought I could just bang out the room in about 3 weeks total. Right now I think it will be 6 weeks to redo that room. So here are some picture of the progress.
Finished taping and spackling.
Here is the inside of the room.
Outside.
Here I am finally finished with the walls. All done attaching all the molding and painting the trim and the walls.
Inside.
Outside. I gotta hand it to the ability of the paint stores to match existing paint from a chip you pull off the wall. The walls in the basement are about 15 years old and they were able to match to the existing paint perfectly.
A close up of the LCD screen I attached to the wall.
