got the plumbing all done , i think .
using the hammer head for a return and also for my skimmer which is a PM xl2 its currently in use on my holding tank so i cant plumb it in until im ready for the move which shouldnt be to hard ..... i also ordered a new dart instead of waiting for the tear down on the holding tank , figured everything else is new might as well get the new pump and test everything before the big move .
over flow pipes . i guess it follows the bean principle . i didnt drill a safety overflow becuase i have alot of extra room in the tank incase one of the over flows plugs , i have alittle over 3" from the water line to the euro on the tank so i think its ok with out it . during testing it all seemed to work pretty good noise wise . no gurgle or anything . only noise i have is from the water flow through the sump .
my return line is 1-1/2 from the hammer head up into a T where it goes into 3/4 pipe . i have 3 returns into the tank and it seems to have alot of flow . but i wont be able to fine tune everything till the skimmer is installed
hard to see , but you can see the 3 returns {gotta get black pvc}
i think im on the right path . going to run the tank with junk water in it for another day , and then drain and start the rock work and stuff . im hoping within the next week i can start adding RO water and start the cycle . this all depends on getting the final walls built around the tank which shouldnt be more than a days worth of work .
any comments please post !