Looking to add a bit of sand to my dt (20-30#). The setup is only 4 months old and the original sandbed has shifted some but mostly settled.
Was thinking of using a funnel, tubing and water to direct the application.
My question is: How much sand can I add on top of my current sandbed without causing issues?
Thanks for looking,
Tom G
Was thinking of using a funnel, tubing and water to direct the application.
My question is: How much sand can I add on top of my current sandbed without causing issues?
Thanks for looking,
Tom G