thatguy559
New member
okay i bought this from someone in san diego and they shipped it to me and forgot to put my unit number in the address and well long story short it sat in the fed ex depot for 2 days before they called me. there are about 70 heads on it and they are loosing their flesh. should i just cut the dead sections off or leave it alon and hope for the best. its been about 2 weeks and i have not seen them extend at all my lights go out at 630pm and i checked at 2am in the morning.