Thanks everyone for the great feedback! As far as ATO, I was planning on a 3 float switch (2 high/1 low) configuration with the Apex. In fact, it is part of a WC system I want to automate. I know it's not helping my cost issue, but automating some of the maintenance and introducing some redundancy is one of the factors I am trying to think through. Great feedback everyone. Thanks!