Well since I am going to be breaking down my 220 to redo some plumbing. (had a major flood the morning of St. James gathering), I figure I will once again use a calcium reactor. I decided to try my hand at making one. I am using a 14" piece of 8"x 1/4" wall cast tubing for the main body. Flanges were cut from 1/4 " sheet and were cut by Fordguy1992 I am going to use a Eheim 1048 for the recirculating pump but if need I will use a Pan world 10PX. I should have it assembled by early next week, ( need to get a few more plumbing pieces). Here are a few pictures of the unassembled parts:
I will contimue as the build goes along. ....





I will contimue as the build goes along. ....