If one wants to plumb directly to the RODI, you have to use a water storage tank.
I set an ATO with quite a few redundancies with an AutoTopOff dual float ATO w/solenoid, APEX with float switches at "low", "set" and "high levels in the sump and a mechanical float switch set just above the "set" level of the ATO ATO.
The ATO ATO does the front line work, the mechanical float secondary if the ATO ATO "set" level float fails.
If the ATO ATO floats fail, mechanical float fails, the "high" float switch hooked up to the APEX I/O will shut off power to the ATO ATO closing the ATO ATO solenoid AND solenoid that feeds the RODI unit and one after the RODI storage tank.
Never had a problem other than replacing the solenoid plunger when it no longer was able to make a proper seal at the seat after 5 years.
I set an ATO with quite a few redundancies with an AutoTopOff dual float ATO w/solenoid, APEX with float switches at "low", "set" and "high levels in the sump and a mechanical float switch set just above the "set" level of the ATO ATO.
The ATO ATO does the front line work, the mechanical float secondary if the ATO ATO "set" level float fails.
If the ATO ATO floats fail, mechanical float fails, the "high" float switch hooked up to the APEX I/O will shut off power to the ATO ATO closing the ATO ATO solenoid AND solenoid that feeds the RODI unit and one after the RODI storage tank.
Never had a problem other than replacing the solenoid plunger when it no longer was able to make a proper seal at the seat after 5 years.