I built a 1200 sq foot movie theater in my house so I should know the drill. Do all the research on the project you are about to build....multiply the time you truly believe it will take by 2. Then add another 20%.
![]()
![]()
![]()
Normally you would build the top rectangle, then the bottom and connect the two. However, some problems with that method on this build....first, because of the size it has to be built on site. Second, the floor is off about 1.5 inches over the 20 feet and last, I don't have an army to help me with this...
So I started by putting the primed and painted (for moisture control) LVL directly on the wall...balls dead level. I connected the bottom plate against the wall...then the legs and then built around it....finished the bottom...then started to connect the rest of the legs. On the left side the leg was close to 1.3 inches longer then the one on the other end...but it is level all the way around. I am going to finish tomorrow.....maybe.
Not to critique ... and you sure look like you know what your doing .... but... I would add support on the back wall ... with 2x4 every 2' or so
just fyi ... im sure your already adding support .. but I thought I would throw it out there