Lunchbucket
Premium Member
1st coat is on!!! Waiting 3hrs to let it dry.
Here is the basement cleaned out and ready to be sealed
1/2 done w/ first coat. That is Mrs. Lunchbucket in the pic
All done w/ 1st coat. 2nd one should go a LOT faster since all the pin holes are sealed up and the 2nd coat will have a smoother surface now
I'll get the 2nd coat on and start framing tonight. Hope to have 1 wall done. More pics later
Lunchbucket
Here is the basement cleaned out and ready to be sealed
1/2 done w/ first coat. That is Mrs. Lunchbucket in the pic
All done w/ 1st coat. 2nd one should go a LOT faster since all the pin holes are sealed up and the 2nd coat will have a smoother surface now
I'll get the 2nd coat on and start framing tonight. Hope to have 1 wall done. More pics later
Lunchbucket