These are some pics of the plumbing done in the actually sump room. I split the feed line to either fill the tank or fill an ATO reserve container for RO/DI:
IMG_20140728_134718 by MrKal_El, on Flickr
Here is the split off the main pumps return line that pumps dirty water to the utility sink back in the Mixing room:
IMG_20140728_134838 by MrKal_El, on Flickr
Lastly, the way the water is circulated in the Saltwater mixing bucket:
IMG_20140728_143435 by MrKal_El, on Flickr
Overall I am thrilled with station and how much labor and time I am saving. WISH I had done this earlier in my tanks life...
Still have some cleaning up to do, but overall the project was a huge success in my mind.
Thanks to everyone that posted and gave tips on these projects.
IMG_20140728_134718 by MrKal_El, on FlickrHere is the split off the main pumps return line that pumps dirty water to the utility sink back in the Mixing room:
IMG_20140728_134838 by MrKal_El, on FlickrLastly, the way the water is circulated in the Saltwater mixing bucket:
IMG_20140728_143435 by MrKal_El, on FlickrOverall I am thrilled with station and how much labor and time I am saving. WISH I had done this earlier in my tanks life...
Still have some cleaning up to do, but overall the project was a huge success in my mind.
Thanks to everyone that posted and gave tips on these projects.