MondoBongo
Obligate Feeder Obsessed
has anyone converted to schedule 80 bulkheads in a schedule 40 hole by downsizing the bulkhead instead of re-drilling?
i have a new tank that has two corner overflows, each overflow is drilled for a 1" drain line, and a 3/4" return line.
i was thinking of replacing the bulkheads with a 3/4" and 1/2" schedule 80 respectively, instead of the normal schedule 40 ones, making them all drains, and running the return plumbing up the back and over the top.
looking at some measurements from BRS, a 1" sch40 fitting requires a 45mm hole, while the 3/4" sch80 needs only a 42mm hole. so i would essentially have an additional 3mm in the bulkhead hole diameter.
it looks like the 1/2" sch80 bulkhead uses a 35mm hole, which is the same as the 3/4" sch40 it would be replacing, so that should be OK.
anyone done this? i really despise schedule 40 bulkheads.
i have a new tank that has two corner overflows, each overflow is drilled for a 1" drain line, and a 3/4" return line.
i was thinking of replacing the bulkheads with a 3/4" and 1/2" schedule 80 respectively, instead of the normal schedule 40 ones, making them all drains, and running the return plumbing up the back and over the top.
looking at some measurements from BRS, a 1" sch40 fitting requires a 45mm hole, while the 3/4" sch80 needs only a 42mm hole. so i would essentially have an additional 3mm in the bulkhead hole diameter.
it looks like the 1/2" sch80 bulkhead uses a 35mm hole, which is the same as the 3/4" sch40 it would be replacing, so that should be OK.
anyone done this? i really despise schedule 40 bulkheads.