Quick update before I leave tomorrow. I needed to tie in both my sumps below because I need to keep the levels in both sumps the same.
So anyway I drove out to Aquatica today because I needed a few short 1-1/2" bulkheads but wound up buying 2- 2" Bulkheads and a 2" quick connect valve. This thing was a monster!!!
(Did I mention they were actually closed) , but were nice enough to let me get what I needed.
I might run two of these , one on each side of the brace.
Heres what I'm talking about in the center of the stand.
Here is how close this valve will be between both tanks, I'm thinking around 1/8" on each side with the pvc glued in place. Right now the tanks are pushed together for mocking up.
Here is some of the plumbing for the feed to the top and the return out of the overflow.
Here is a pic of the returns I have together so far, I guess I'm going to run the returns into the holes where the top of the old overflow openings were, so I can install lids on the center openings , try to control some evaporation and humidity.
This is how I was thinking about running the closed loop section off the back of the tank in the center, giving it a somewhat a circular water rotation and then going back to the overflow teeth in the top of the corners. I'm sure I'm going to have to run those bendable returns and point them in the direction I want to eliminate any cavitation and the top. We'll see.
This is what I threw to the side to make this project happen this year.
I can't wait to get back in that thing next season for some 1/4 mile passes. :eek2:
Hope you guys enjoy your Turkeyday, of corse on the 24th.
I'm bringing the camera and laptop with, so if I see anything cool I'll take some pics and I'll be sure to share with everyone.