Hey folks,

I just got back from Lowes and got every thing except flooring to finish the fish room.

I have the electrician coming to add the 2 20 amp circuits.

I'm looking for help ruffing in, hanging and finish drywall and painting.

I hope to have it all finished this week end.

Even if you are DIY challenged you can lift and hold stuff. I need help moving the stand for the 150 out of the room.

Ill have Pizza and beer and even toss in a few frags.

The demo starts tonight!
 
Greg, I still have plans to help. I might be able to help Friday afternoon, but definitely Saturday.
 
cool, I have got to get er done so I can set the 150 up.


The pump is dieing on the 65 and I don't want to have to replace it when I have everything to get the 150 running.
 
First I would like to thank Bruce (Brucem) and Mike (lookout888) for all the help and great ideas.

The electrician put in 2 20 amp circuits with an outlet on the porch for the chiller, and switch for the can lights in an existing block wall.

We got the old ceiling torn out can lights installed insulation and furring strips installed.

Mike said as long as the ceiling was out that I should install an exhaust fan. I could not resist even though it was not in my budget.

room1.jpg

room2.jpg

room3.jpg

room4.jpg


The work continues drywall goes up tomorrow.
 
<a href=showthread.php?s=&postid=9381842#post9381842 target=_blank>Originally posted</a> by kirdes
Looking good so far!!

Thanks there is still a lot of work left.

Hang dry wall
Mud and tape
Texture walls and ceiling
Paint
Floors
hang and paint Base boards
 
john,

Ill still be going at it, All the drywallis up and Im tapeing and mudding now more tomorrow, probably texture on teusday or prep for paint.
 
Yesterday we got the drywall hung. Thanks Stephen (boydx6) and Nate (natec) for all the help and I hope you are not as soar as I am.

After Stephen and Nate left I decided to start on the Tape and mud. I got all the walls finished but couldn't raise my hands over my head long enough to do any real work on the ceiling, it was 12:30 so I just took a shower and went to bed.

room5.jpg

room6.jpg

room7.jpg

room8.jpg


This morning I was up early for work and the house was a wreck, drywall dust everywhere, I took a pick of last nights progress and headed out to get a sheet of drop cloth before I started sanding.

I didn't get any picks of the dust cloud but will snap one in the morning.
 
O2, it has only been through the help of some great guys.

Congrats on the 90.......I hope to have the 65 up for sale in a month, it has a like new ER 5-2 skimmer, if you still need one then.
 
I sanded all the joints and added another coat of mud and sanded again, textured the walls and ceiling. Tomorrow Ill clean up the mess and through on a few coats of paint and finish the electric.
room9.jpg

room10.jpg

room11.jpg
 
dam that is looking good greg.now you are making some real progress on the setup.is the whole right side of the tank going to be closed off to make the entry to the room?
 
<a href=showthread.php?s=&postid=9402859#post9402859 target=_blank>Originally posted</a> by checkinhawk
dam that is looking good greg.now you are making some real progress on the setup.is the whole right side of the tank going to be closed off to make the entry to the room?

Chris,

No it will be in the same position as the first pic, there will be doors on the right side for access to the sump and fuge and there will be room so Ill be able to walk behind the tank.
 
Back