Thanks for all the kind words guys!
OK here is and update. The day after the tank went in I went away for a week on business. Then came back and was on vacation for a week. So virtually nothing has been done on the tank. But now relaxing time is over, time to get back to work.
The only thing I was able to start was, first off, fixing the finish. Before I put the tank down I put some blue painters tape on the edge of the stand top to protect the finish from any scratches when bringing the tape on. Unfortunately the tape pulled pieces of the finished off when it was removed. So much for protecting the finish. Turns out you are not supposed to use that kind of tape with poly finishes. Anyway, I have been trying to fix the finish but I don't think I am going to be able to get it back to what it was.

I've still got top play around with it but I don't think it will come out perfect.
The other piece I started to play with is making the drawers for the stand. If you remember, I decided to use drawers in the stand rather than doors. I've never installed drawers before so I needed to practice a bit to get it down.
I've got a ton of pictures from the tank move I will post later on today, I'll also get some pictures of the other stuff I've been doing.
Jim, I have not braced the floor under the tank yet. The whole sump room under the tank is going to be redone, That should get started next week.