mrx66699
New member
here is a video of things coming together behind the scenes and some of the current fish.....still need to clean up some of the wireing, finish the kalk reacter, doseing pumps, .....and well quite a few different things but this should give a good idea of how far along things are....oh and you will have to disregard the yellow tint to the lighting for the time being in the dt as the lights are not on it yet and its just the lighting from the hallway and any natural lighting coming in from outside
<embed width="600" height="361" type="application/x-shockwave-flash" allowFullscreen="true" allowNetworking="all" wmode="transparent" src="http://static.photobucket.com/player.swf" flashvars="file=http%3A%2F%2Fvid17.photobucket.com%2Falbums%2Fb70%2Fmrx66699%2F540%2520Build%2FVIDEO0081-1.mp4">
<embed width="600" height="361" type="application/x-shockwave-flash" allowFullscreen="true" allowNetworking="all" wmode="transparent" src="http://static.photobucket.com/player.swf" flashvars="file=http%3A%2F%2Fvid17.photobucket.com%2Falbums%2Fb70%2Fmrx66699%2F540%2520Build%2FVIDEO0081-1.mp4">
Last edited: