So after talking to Floyd I'm going to add a drain to the bottom of my ATS. I guess you can end up with vacuum lock with side drains like what I have. I'll have to pick up a bulk head. I want to see how big a 1" is. It looks like it maybe a tight fit. If it's to tight I'll go with two 3/4" drains. I know two smaller drains like that is not ideal but I think I will be fine. The flow is going to be pretty low and at that point I would have 4 drains.
Cut a hole in the top of the barrels for my water storage also add the float switch I had to one of them. I need to pick up another float switch and some PVC.
Ordered some parts for my ATS and my mixing station. Will probably finish off ATS next week and water test it. Will also work on the mixing station some more and post pictures. Hope everyone had a good few days off.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.