have'nt seen the pin method :explain please<a href=showthread.php?s=&postid=12536290#post12536290 target=_blank>Originally posted</a> by Electrobes
Are you using the pin method for the contruction of the tank, or just the taped method alone?
<a href=showthread.php?s=&postid=12571542#post12571542 target=_blank>Originally posted</a> by dne63
Well I finished glueing it all up and water tested it. I found 3 little pin hole leaks so I had to go back and fix those. I did change my mind and go with a 4" eruo rail all one piece instead of 2" separate pieces. So I,ve now had it filled to 2" from the top for 3 days now and no leaks and even more satisfying no sign of any bowing whatsoever none!!![ boy I want to say I told you so to all those that said it would but I won't] Now its time for the plumbing and sump and stand. I'll keep you posted.
![]()
![]()
![]()
![]()
I'll keep you up to date and if your in greensboro drop by and check it out , I've got tons of frags to fill it with so I'll be posting more pic's of that as well, Dave E
<a href=showthread.php?s=&postid=12573354#post12573354 target=_blank>Originally posted</a> by dne63
with the 2" there was no way to have one end of ea. over a corner so it was either go back and have one whole piece cut 2"w or go with the 4" for about $25 more so it was worth it just for extra strength