have'nt seen the pin method :explain please<a href=showthread.php?s=&postid=12536290#post12536290 target=_blank>Originally posted</a> by Electrobes
Are you using the pin method for the contruction of the tank, or just the taped method alone?
<a href=showthread.php?s=&postid=12571542#post12571542 target=_blank>Originally posted</a> by dne63
Well I finished glueing it all up and water tested it. I found 3 little pin hole leaks so I had to go back and fix those. I did change my mind and go with a 4" eruo rail all one piece instead of 2" separate pieces. So I,ve now had it filled to 2" from the top for 3 days now and no leaks and even more satisfying no sign of any bowing whatsoever none!!![ boy I want to say I told you so to all those that said it would but I won't] Now its time for the plumbing and sump and stand. I'll keep you posted.
I'll keep you up to date and if your in greensboro drop by and check it out , I've got tons of frags to fill it with so I'll be posting more pic's of that as well, Dave E
<a href=showthread.php?s=&postid=12573354#post12573354 target=_blank>Originally posted</a> by dne63
with the 2" there was no way to have one end of ea. over a corner so it was either go back and have one whole piece cut 2"w or go with the 4" for about $25 more so it was worth it just for extra strength