To keep everyone updated:
I have managed to finiskh off the quarntee system completely.
Also in the main tank I have re siliconed all the bits for a better look.
Finished the return plumbing too.
Now I am currently working on making the return pumps dry inside the sump. Made a box looking like this!
The intakes are different from each other to make sure the water is sucked from all around the sump.
Now A big problem I have. How do I return this water form the pumps to the tank. I am currently thinkin of drilling two 40 mm hole to the side of one of the flow boxes and letting the water run out from there! Something similar to this box by usning silimar attachment tools. Something like bulkheads!
direction? Would tWould this be too much current in one his be too much surface current? Should I direct one of them towards the centre by using a 45 degree elbow?
I am not sure what to do. I want to keep everthþng very simple: Here is a simple drawing I made. So if you can play around with them to show what ý should exactly do?
Thank you again forum!
Key:
Wbox: Wave box Tunze
T 12: Tunze Stream 12 000 L
T 20: Tunze Stream 20 000L
Rd: Red Dragon 14 K Returns!