jjjimmy
Premium Member
I want to add a closed loop to my set up but I do not want to completely break my tank down to drill holes in my AGA tank.
So...
Is it possible to tee off of the drains in the overflows (one on each side) for the feed and then run an OM 4-way up the back and over the top of the tank to the four corners? I am more concerned about the drain feeding the CL pump than the return plumbing to the tank.
TIA
Jimmy
So...
Is it possible to tee off of the drains in the overflows (one on each side) for the feed and then run an OM 4-way up the back and over the top of the tank to the four corners? I am more concerned about the drain feeding the CL pump than the return plumbing to the tank.
TIA
Jimmy