Ok,
I need some input on plumbing my MRC CR3 dual calcium reactor. I tried a tee off the suction of the skimmer pump (Blueline HD70), but that just sucked all the water out of the reactor.
I have a tee on the discharge of my return pump (Sequence 1000 SW 3200), that I could use, but would that be too much? I wouldn't want all that pressure to channel the reactor media and minimize contact time.
Does the Iwaki MD20 pump on the reactor have enough draw to do an up and over?
Is there some type of self piercing device I could use to put a hole in the sump (Rubbermaid 100g stock tank) and draw from there?
I really need to get this reactor up and running.
Thanks,
Mike