NaClH20NMYVEIN
Red Dragons!
Over the past 2 weeks I have made some progress on the shed. I really wanted to get it done before the 110 degree weather hit here but no luck. The rough electrical is done, insulation is mostly done as well as the inside walls. I still need to finish up the insulation, plastic, walls, FRP and expoy the floors(hopefully this weekend). Then it will be on to the AC and running my power over to the shed and installing the subpanel.
I have also decided to listen to the experts on here and turn the drywall around inside the house. Hopefully in the next few weeks I will pull all that down, plastic it and put it up with the correct side facing out.
I have also decided to listen to the experts on here and turn the drywall around inside the house. Hopefully in the next few weeks I will pull all that down, plastic it and put it up with the correct side facing out.