Floyd R Turbo
Either busy or sleeping
my 2c here
it looks like you welded the fittings into the bulkheads in the box. this is not necessary with an external box. you don't need them to be sealed 100%, just friction fit.
This means you can get rid of all of those sweep tees and threaded caps, there is air trapped in the siphon line that might be slowing it from purging. Just use a small section of pipe and a 90 out of the siphon bulkhead, then push a street 90 into it. You can remove that if you need to clean - don't bond it.
With the OC, what I use is a P-trap with a plug. They come in 1.5", not sure they come in 1". Anyways you can keep what you have for that but raise it up. Think of it as the OC controlling the operating water level of the external box. I find that the nice set point (adjust sihpon gate valve) is such that the normal (stable) operating water level in the external box is at the centerline of the inside of the OC pipe horizontal cross section. If that makes sense.
Tie the OC airline to the top of the e-pipe opening, face down. So when the water level nears the top of the e-pipe, the OC will start closing off. If the water continues to rise, the E will kick in, for a short time.
For the E-drain, you need only a straight pipe, all the other stuff you have is not really necessary.
it looks like you welded the fittings into the bulkheads in the box. this is not necessary with an external box. you don't need them to be sealed 100%, just friction fit.
This means you can get rid of all of those sweep tees and threaded caps, there is air trapped in the siphon line that might be slowing it from purging. Just use a small section of pipe and a 90 out of the siphon bulkhead, then push a street 90 into it. You can remove that if you need to clean - don't bond it.
With the OC, what I use is a P-trap with a plug. They come in 1.5", not sure they come in 1". Anyways you can keep what you have for that but raise it up. Think of it as the OC controlling the operating water level of the external box. I find that the nice set point (adjust sihpon gate valve) is such that the normal (stable) operating water level in the external box is at the centerline of the inside of the OC pipe horizontal cross section. If that makes sense.
Tie the OC airline to the top of the e-pipe opening, face down. So when the water level nears the top of the e-pipe, the OC will start closing off. If the water continues to rise, the E will kick in, for a short time.
For the E-drain, you need only a straight pipe, all the other stuff you have is not really necessary.