StrategicReef
New member
Hi Roger I hooked up 7095 and 2 streams 6101.
I was wondering how to add the Tunze power outage module and a 12V battery. It looks like I could do with just one, in that case does the battery take over and power 1 of the streams plus the 7095 controller. Since the controller apparently draws power via the DIN cable off the junction box of the stream?
Would the stream be also become more like 6000 since it has 12V supply when power is out... and continue to pulse or do intervals (even with one pump).
I was wondering how to add the Tunze power outage module and a 12V battery. It looks like I could do with just one, in that case does the battery take over and power 1 of the streams plus the 7095 controller. Since the controller apparently draws power via the DIN cable off the junction box of the stream?
Would the stream be also become more like 6000 since it has 12V supply when power is out... and continue to pulse or do intervals (even with one pump).