Aquascaping, Show your Skills...

Forgive me since my tank is <180 gallons, but I'm proud of what I came up with for my 120. Tank has been running since January.
IMG_3386_zps1ae47205.jpg

From the top (the small island in center left will be for a BTA in 3 months):
IMG_3393_zps07483597.jpg

i wouldn't mind seeing more of this, you've made good use of the space in the 120. I really like it
 
this was my 120. torn down about 2 months ago, all this rock will be re-used in my current 180 build. I'm lucky to own a few pieces of the most beautiful rock i've ever seen.

IMG_6044.jpg


DSCN0275.jpg


DSCN0298.jpg


DSCN0388.jpg
 
Here's my scaping time lapse of DT which is 96X48X30. Really wish the tank was taller after doing scaping, but that will be my next build! If you feel like checking out the whole build build thread is here. Sand to be added once I've let the Marco Rock cure in tank on closed loop dosing LaCl to ensure phosphates don't leach!



Cabinetry finished this weekend and held up temporarily to see it fit right.

20130407_121317_zps1b12f1e5.jpg
 
This in in a155 bowfront. You. Cant see how deep it is. But. It has a ton of caves and ledges for. Coral /)
 

Attachments

  • image-1829153363.jpg
    image-1829153363.jpg
    40.1 KB · Views: 5
Here's my scaping time lapse of DT which is 96X48X30. Really wish the tank was taller after doing scaping, but that will be my next build! If you feel like checking out the whole build build thread is here. Sand to be added once I've let the Marco Rock cure in tank on closed loop dosing LaCl to ensure phosphates don't leach!



Cabinetry finished this weekend and held up temporarily to see it fit right.

20130407_121317_zps1b12f1e5.jpg

Other than the "plumbers view" Great job!
 
This is the first pass at the 210. I expect some more work on the right side once the overflow box is installed as well as some center shelf work. The ideas is a double island / horse shoe effect with land slides. I have a good amount of smaller rubble on hand to finish out the edges as well.
 
Don't think I've posted in here yet. This is the scape on the new 187.

3egabegy.jpg


u7u8egym.jpg


9a2e5yqe.jpg


e7atubys.jpg


Most of the structure is elevated and held together using CPVC.
 
Back
Top