And finally.. an update. Sorry guys, been busy busy busy.
Gas meter was finally upgraded to accommodate the generator, heater, and water heater. This one is about 4x the size of the one we previously had.
Panel finally up on the wall, being wired.
Gas line trench, 1-1/2" line to allow for future growth.
Really had a difficult time finding an honest, fair plumber to install the gas lines for us. I'm sorry, but $2000 for 2 days of labor, when we already had the trench dug and the permits obtained.. no thank you. Ran them all our selves. Everything pressure tested, inspected, and kosher. Feels good!!
Pouring the slab for the generator pad. 14" thick to get it high enough, as the finished grade isn't quite right yet.. (pavers still need to be installed)
They expect you to put two steel pipes through the base of the generator and then four burly dudes would each grab a corner and try to carry this 500lb beast onto the slab.. No thank you! We have a better idea.
Generator set..
Gas meter was finally upgraded to accommodate the generator, heater, and water heater. This one is about 4x the size of the one we previously had.
Panel finally up on the wall, being wired.
Gas line trench, 1-1/2" line to allow for future growth.
Really had a difficult time finding an honest, fair plumber to install the gas lines for us. I'm sorry, but $2000 for 2 days of labor, when we already had the trench dug and the permits obtained.. no thank you. Ran them all our selves. Everything pressure tested, inspected, and kosher. Feels good!!
Pouring the slab for the generator pad. 14" thick to get it high enough, as the finished grade isn't quite right yet.. (pavers still need to be installed)
They expect you to put two steel pipes through the base of the generator and then four burly dudes would each grab a corner and try to carry this 500lb beast onto the slab.. No thank you! We have a better idea.
Generator set..