My Installer is a NO show
My Installer is a NO show
My Contractor Installer Designer Buyer of all components that he recommended for my expensive system/setup has not shown up to continue with the work since the last week in January. He has yet to replace the power supply for the pump that failed, the light fixture that he said he will have replaced, fix the skimmer that leaks at the gaskets, the CR that seeps, work on eliminating the bubbles and on insuring that the sump can hold the water needed in case of a power failure, finish the racks for the frags tank...
Has yet to install the doser pump, setup a reliable ATO system, extend the water return piping, hang and stop the leaks from the RO/DI unit, repair the walls and ceiling that he had to open to do the install, complete the finish framing of the tank and doors below the tank on both sides, install the exhaust and intake system, hookup the internet wiring to the APEX system. Move the 65g tank in place, finish framing the closet, repair the ceilings he busted and paint and epoxy all and etcccc.
What finally/really got to me more than anything else, is him not caring, when I told him that my wife was coming home from a double knee replacement surgery and I pleaded for him to come and close up the wall he opened up because she needed to sleep on the ground floor in that FR but he could not come...
We are patiently waiting for him to cure whatever is ailing him or whatever other business is keeping him from finishing our work.We agreed on this project back in early June or thereabouts... I liked and respected this guy and his work but he has let us down big time!!! He said he was coming on April 8th, he was a no show and did not call to apologize and says that he forgot to call us that he was not coming. He then was to come this Tu but he emailed me on Monday that he "have to postpone tuesday, still having issues, sorry " and so he did not make it today Tuesday the eight of April. I am a bit upset!!! having my home partially in shambles for a project that was to be completed in two three months MAX.. we are now over nine ten month since first payment was made. Was hoping that contracting the work will get me a nice job done in a timely manner... Sorry to dump on U all...
My Installer is a NO show
My Contractor Installer Designer Buyer of all components that he recommended for my expensive system/setup has not shown up to continue with the work since the last week in January. He has yet to replace the power supply for the pump that failed, the light fixture that he said he will have replaced, fix the skimmer that leaks at the gaskets, the CR that seeps, work on eliminating the bubbles and on insuring that the sump can hold the water needed in case of a power failure, finish the racks for the frags tank...
Has yet to install the doser pump, setup a reliable ATO system, extend the water return piping, hang and stop the leaks from the RO/DI unit, repair the walls and ceiling that he had to open to do the install, complete the finish framing of the tank and doors below the tank on both sides, install the exhaust and intake system, hookup the internet wiring to the APEX system. Move the 65g tank in place, finish framing the closet, repair the ceilings he busted and paint and epoxy all and etcccc.
What finally/really got to me more than anything else, is him not caring, when I told him that my wife was coming home from a double knee replacement surgery and I pleaded for him to come and close up the wall he opened up because she needed to sleep on the ground floor in that FR but he could not come...
We are patiently waiting for him to cure whatever is ailing him or whatever other business is keeping him from finishing our work.We agreed on this project back in early June or thereabouts... I liked and respected this guy and his work but he has let us down big time!!! He said he was coming on April 8th, he was a no show and did not call to apologize and says that he forgot to call us that he was not coming. He then was to come this Tu but he emailed me on Monday that he "have to postpone tuesday, still having issues, sorry " and so he did not make it today Tuesday the eight of April. I am a bit upset!!! having my home partially in shambles for a project that was to be completed in two three months MAX.. we are now over nine ten month since first payment was made. Was hoping that contracting the work will get me a nice job done in a timely manner... Sorry to dump on U all...