phizzle
New member
Finally got a chance to update. Pretty much finished moving out to an apt with my wife within the past week. Finished the stand during that time. Planning to build a better stand down the line but this is good enough for now. Drilled the tank and installed overflow. Painted the back blue. Still need to install the plumbing. Planning on putting some water in today with water from my existing tank and some freshly mixed water with some lr and ls. I'll add more pics later. No internet at the apt yet so have to do with cell phone pics. Still have to build canopy...hopefully have it finished by end of the week...
Edit: issues with my phone...can't copy photobucket link cause the phone sucks. Can't upload either bec I can't shrink the size of the pic on this phone...gotta be patient until I get to my parents house to upload pics...
Edit: issues with my phone...can't copy photobucket link cause the phone sucks. Can't upload either bec I can't shrink the size of the pic on this phone...gotta be patient until I get to my parents house to upload pics...
Last edited: