falconut
New member
Recently got a 180 gallon reef ready tank. The tricky part is that I will probably be moving around 3 years from now, so I'd like to connect to the bulkheads and be able to remove the connections to get the bulkheads out for the move. If I do the typical install of gluing PVC and fittings to the bulkhead, I'll have to cut the pipes and have to re plumb all over again.
All 4 of the holes are for 1" bulkheads. I was hoping to glue a small piece of 1" pipe and slipping a section of braided hose over with a hose clamp. Only issue I'm seeing is that the charts have the O.D. of 1" PVC at 1.315" and the braided hose I'm finding is either 1.25" or 1.5".
Has anybody tried either of these or have a better method to accomplish this?
All 4 of the holes are for 1" bulkheads. I was hoping to glue a small piece of 1" pipe and slipping a section of braided hose over with a hose clamp. Only issue I'm seeing is that the charts have the O.D. of 1" PVC at 1.315" and the braided hose I'm finding is either 1.25" or 1.5".
Has anybody tried either of these or have a better method to accomplish this?