![]()
Here is my ghetto schematic as promised. I have no specifics on wire colors coming from the pump side as I have not hooked up my multimeter to it to find out. I know from the Jebao controller side of the unit, the light blue wire is negative ground (-24v), reddish/orange/brown wire is positive (+24v), and the remaining third wire is the va signal wire to the pump. Simply test the 3 wires with a multimeter and label them before starting any wiring or splices.
Thanks RJ, you're a God send. Last question.....for the moment anyways. When I splice in the Ethernet cable to the Reef Angel cable how long of an Ethernet cable can I use before I need to start worrying about signal loss? Are we talking about lengths not usually experienced in reef keeping? I'm thinking about future endeavors where I plan to have a 75 gallon tank on the first floor common sumped to my 180 in the basement. Just curious. Thanks!

just working on the programming now. I am having trouble with a "feed" profile I made that wont come on when the feedA is selected. I want the right pump to come on at 20% and only go to 50% over the 5min feed time here is what I have.
Feed profile
Ramp time (minutes) 5min
Start intensity 20
End intensity 50
Set Wave2
If Time 08:00 to 10:59 Then Wave1
If Time 11:00 to 14:00 Then Wave2
If Time 14:01 to 21:30 Then Wave1
If Time 21:31 to 07:59 Then night1
If Outlet Timer1 = ON Then Surge1
If Outlet Timer2 = ON Then Wave1
If Outlet Timer3 = ON Then Wave2
If FeedA 000 Then Feed
Can someone help me understand how the program outputs to the Variable Speed ports on the Apex? I pretty much understand the programming (both Slief's and wfogixxer's) as to how things ramp up and down. What I am confused on is how you know which of the VS ports is being controlled by the programming. In other words if I have 2 WP40s and a cable for each tied back to my Apex how do I know which VS port (and its associated WP40) is being controlled by which program? I know I've hijacked basically all of page 9 but any help would be greatly appreciated.
Do you put the programming under the VS you want to control just like you would any other port?
Thanks!
Arduino 5v pwm works just fine on the pump.