hdtvguy
New member
A little more progress on the tank and the plumbing. I was having problems with the lack of space I have on the side of the tank where all the plumbing and the closed loop pumps are. I wanted the closed loop pump and the Gen-X PCX 55 pump to be up as far as I could get them so I will not loose much head. It should be worth the extra effort
The area will have a access door on the side and the whole stand both sides will be drywalled in. My return pump and sump will still be located in the basement.
We got the braces on the tank also installed the small overflow box but still have to get black plexi around it. Also got the Starboard in.
Here are a few pics of the progress.
The area will have a access door on the side and the whole stand both sides will be drywalled in. My return pump and sump will still be located in the basement.
We got the braces on the tank also installed the small overflow box but still have to get black plexi around it. Also got the Starboard in.
Here are a few pics of the progress.