Okay, plumbing is done. I’ll likely wait until next weekend to start filling it since I’ll be working in the office all week. I don’t want to fill and not be able to monitor for leaks.
To do list:
- Fill tank
- Start return pump
- Get heaters (2 300w) going
- Add salt
- Order/build T-Slot light frame
- Install lights
- Adjust water parameters
- Move livestock from old tank
- move RODI and build water mixing storage
- Breakdown & sell old tank
- Phase 2 of basement finish can then begin
- Set up frag tank
I’m still up in the air about doing a remote fuge. I’m going to use the fuge portion of the sump as a cryptic sponge area.
To do list:
- Fill tank
- Start return pump
- Get heaters (2 300w) going
- Add salt
- Order/build T-Slot light frame
- Install lights
- Adjust water parameters
- Move livestock from old tank
- move RODI and build water mixing storage
- Breakdown & sell old tank
- Phase 2 of basement finish can then begin
- Set up frag tank
I’m still up in the air about doing a remote fuge. I’m going to use the fuge portion of the sump as a cryptic sponge area.