I installed an Arid C36, I hard plumbed it into the manifold, detailed the plumbing below in case anyone is thinking of also hard plumbing an Arid reactor and is looking for ideas.
Due to needing to open it up to remove chaeto every so often, I decided to add a ball valve after the gate valve, I can dial the right flow in with the gate, then when it comes to opening it up, I just shut off the ball valve without disturbing the settings. Then can open up the drain ball valve to make it less messy when removing chaeto.
Union to make it easy to remove and clean when needed.
The outlet with another union. This is where it gets interesting. You'll notice 2 ball valves, this will allow me to direct flow back to the sump or into the planned frag tank. Also will allow me to isolate the frag tank if I ever feel the need.
Return line running back to the sump. With all the return pipes from the manifold, the varying flow has helped keep detritus from building up in the sump
Current flow readings for the return, UV, Arid Reactor, & Carbon Reactor.
Sent from my iPhone using Tapatalk