BeanAnimal
Premium Member
Left hole - emergency. Use an upturns elbow and vertical,pipe to get it to the desired height.
Middle hole - open channel. Set the height as needed with vertical pipe and 2 elbows to form a u tube.
Right hole - siphon. Down turned elbow. This should allow you to adjust the water level in the box.
Worst case you could upturn the siphon elbow and add a vertical pipe and the another u suction.
That or simply rebuild the box, now that you know where the problem is.
Middle hole - open channel. Set the height as needed with vertical pipe and 2 elbows to form a u tube.
Right hole - siphon. Down turned elbow. This should allow you to adjust the water level in the box.
Worst case you could upturn the siphon elbow and add a vertical pipe and the another u suction.
That or simply rebuild the box, now that you know where the problem is.