The time is NOW....
After the kitchen remodel running a bit late...
Time to break ground on the Fish Room
The tank is due to arrive Friday
All other equipment is here!
The tank its self was protected. the top was open and something fell into it that caught the braces and broke the tank.
Im just glad the replacement will be here in 2 weeks
The replacement tank should be here in a week or two. delays in the silicone curing time due to the cold.
Floor & Sink Drain has been plumed.
Walls up on the fish room.
The wall on the left will be removed. The grey conduit carries my main electrical feed to the house. I will reroute that next week.
The FRP is not much fun to work with as it is very flimsy on it's own.
you have to use glue and nails to hold it up and you need to brace the ceiling piece until the liquid nails sets up. best to have 3 people for the ceiling and 2 for the walls
Any updates on tank? I will still help if needed and schedule allows. I like the FRP. Only went halfway up walls in my fish room, but works really well.
Status Update!
Okedokee....
The tank is here.. I drove up to Dallas to get it.
I did not realize how difficult it was to take a good pic of a empty tank!
More coming... Pouring concrete today !@
Check out that Super Sexy Cross Bracing... Stainless Steel Tie-Rods!