Floor slab is in, perfectly level in both directions. Wall slab will go in next week. I had them laminate a piece 1/4" higher around the perimeter & cut a trough in the middle. I notched the bottom plate to align with the trough. I'll waterproof & silicone the wood plate, if anything ever leaks it will hit the slab & eventually make it's way to the trough, through the wall, directly into the floor drain. And it's going to look nice too!
1000007546.jpg
 

Attachments

  • 20240718_161150.jpg
    20240718_161150.jpg
    842 KB · Views: 10
Floor/wall slab in, carpet tucked, light bar gets hung on Monday... then Aug 7 is tank plumb day! Finally! Getting real close to putting water in it. The 35yr old live rock is fully cured & ready.
 