Seriously, Im so backlogged now it isnt funny. I put off alot of smaller projects (like the 'power tower' that houses all the Aube timers, sockets, switches, tunze controller+transformers, HQI ballast, etc. and stants next to the tank), because the steel stand was taking forever (2 months behind intended arrival)... but now that its here... all the spare time I get is going towards it. And since its been a while since first thought of, I have reworked some ideas all together and so I have to get crackin if Im going to have this thing up and going in the next week. Everything is planned out, but I have some legwork to do...
When I get a chance... but I have many other things to do as well... other pumps that I have modded need complete tests, and T5 bulbs as well as reflectors that I have been sent need testing. And then there are 3 skimmers that I have about 1/2 made that need completing...
Im very, very backlogged.